Execution of Nui Beo Mining Project, Quang Ninh province

CJC 204 is performing the execution of Administration & Utility Building – Nui Beo Mining Project. This includes 3-floor building, two compartments, total slab area is 6820m2. The column spacing is 7.2m with span of 6m, the corridor’s width between two compartment is 2.4m, the distance between 2 compartments is 4.5m, the height of each floor is 2.6m. The total investment capital is VND 50 million and the schedule is 8 months.